Category Archives: NRAO/Charlottesville EOS

Due to the high probability forecast for inclement weather starting first thing tomorrow morning and increasing throughout the day, Emergency Operation Status (EOS) has been declared and NRAO facilities at Edgemont Rd. and CDL will be CLOSED on Tuesday 2/11/25. Those employees of the observatory that cannot work remotely during this period will need to use ADM01.25.14.4511.01.00 (EOS Nonworked) as the project code in Costpoint with your managers approval.

In the event of an unexpected change in weather an amended message will be sent by email to increase the duration of the closure. You can also call 434-296-0200 or check : https://info.nrao.edu/staff under the “NRAO Facilities Status” section on the left side of the page, OR visit https://status.nrao.edu/ .

Thank you,

Josh Bullock

For Friday, March 6th, both CV and GB locations will open on a 2 hour delay

For Friday, March 6th, both CV and GB locations will open on a 2 hour delay: Charlottesville will open at 10:30am, Green Bank will open at 10am.

Posted in GB, NRAO/Charlottesville EOS | Comments Off on For Friday, March 6th, both CV and GB locations will open on a 2 hour delay

NRAO (Charlottesville) Network Downtime – Resolved

UPDATE: Feb 5, 2015 22:15 US/EST: All systems needing a reboot have been done; minor work remains on scattered cluster nodes, and two internal but non-critical servers. UPDATE: Feb 5, 2015 21:00 US/EST: network maintenance has been done; cluster restoration … Continue reading

Posted in Info, NRAO/Charlottesville EOS, Observatory-Wide | Comments Off on NRAO (Charlottesville) Network Downtime – Resolved

Maintenance of ‘safe.nrao.edu’ – RESOLVED

The web site safe.nrao.edu is back online following a brief maintenance outage to increase the available disk space. Total offline time was less than 5 minutes. All services on safe.nrao.edu should now be functioning normally.

Comments Off on Maintenance of ‘safe.nrao.edu’ – RESOLVED